§ 12-6. Fees established; schedule.
It shall be unlawful for any person to fail to pay any fee that is required to be paid by this chapter. The following fees shall be paid before a permit or certificate of occupancy is issued, an appeal is filed, an inspection is conducted or a service is rendered:
(1)
Alcoholic beverage applications.
New locations (base fee): see zoning permits
Transfer application (name only) ..... 35.00
Use of the City alcoholic beverage license by for-profit organizations or groups ..... 1,000.00
Extended hours permit:
New application ..... 100.00
Renewal ..... 50.00
(2)
Business inspections, certificates and release of power inspections.
Business license inspection including, but not limited to, inspections requested by department of children and families for renewal of State licenses, e.g., day care centers and congregate living facilities. ..... $50.00
Special event (to be obtained by person promoting or sponsoring the event) ..... 30.00
Home occupation ..... 30.00
(3)
Contractor certification. (Class A, B, C) ..... $30.00
(4)
Fire department.
Appeals.
Appeal authorized in chapter 13 ..... $100.00
Training.
Fire extinguisher class ..... 130.00
Plan review.
Review of plans submitted to development services for compliance with the life safety codes ..... 75.00
Plan revisions.
Resubmitted plans review per revision request:
First page ..... 35.00
Each additional page ..... 10.00
Permits.
Preinspection for any permit ..... 25.00
Indoor public assembly, per event ..... 50.00
Bulk storage tank ..... 100.00
Compressed gas ..... 50.00
Dust atmosphere ..... 50.00
Extreme hazardous activity ..... 100.00
Extreme life safety hazard ..... 50.00
Fireworks display ..... 100.00
Flammable and combustible liquids ..... 50.00
Hazardous materials storage and use:
Short form ..... 25.00
Regular form ..... 100.00
Hotwork ..... 50.00
Outdoor fire (ceremonial) ..... 50.00
Pyroxylin ..... 100.00
Spray, dip and flow coating operations ..... 50.00
Storage of explosives ..... 100.00
Tent and temporary structure ..... 50.00
Note— Separate fire department permit required. These permits are in addition to any building permits that may be required.
Fire code inspections of existing structures: All existing residential structures, except for one- and two-family dwellings, shall be inspected by the Fire Marshal and a fire code inspection fee shall be assessed based on the total square footage of the entire residential structure, including common areas. Individual units and common areas or occupancies within an existing commercial structure shall be inspected by the Fire Marshal and a fire code inspection fee shall be assessed based on the total square footage of each individual unit and of each common area. The inspection fee for an existing commercial structure including common areas, with no individual units will be based on the total square footage of the entire existing structure.
Square footage and fee:
Under 5,000 ..... 50.00
5,000 to 10,000 ..... 60.00
10,001 to 20,000 ..... 70.00
20,001 to 30,000 ..... 80.00
30,001 to 40,000 ..... 90.00
40,001 to 50,000 ..... 100.00
50,001 to 60,000 ..... 110.00
60,001 to 70,000 ..... 120.00
70,001 to 80,000 ..... 130.00
80,001 to 90,000 ..... 140.00
90,001 to 100,000 ..... 150.00
Plus $35.00 for each 10,000 square feet, or portion thereof, above 100,000 square feet.
Reinspection ..... twice the
initial feeInspections required for the issuance of State licenses (licensure inspections) ..... 75.00
(5)
Housing inspections.
HUD, VA, FHA and other requested or required inspections:
Single-family dwellings ..... $30.00
Multifamily dwelling:
First unit ..... 30.00
Each additional unit ..... 10.00
Rooming units (hotels, motels, roominghouses, guesthouses, etc.):
One to five units ..... 30.00
Each additional unit ..... 5.00
Reinspection fee:
Second reinspection and each additional reinspection:
Single-family dwellings ..... 10.00
Multifamily dwelling units:
First unit ..... 10.00
Each additional unit ..... 5.00
Rooming units (hotels, motels, roominghouses, guesthouses, etc.):
One to five units ..... 10.00
Each additional unit ..... 3.00
(6)
Construction Services Division—Services, Permits and Fees.
Service Fee Construction Valuations for permit fee purposes:
Permit fees for new construction shall be based on the valuation of the proposed work. The valuation shall include all labor and material cost. The valuation shall be based on the most recent published values per square foot as established by the International Code Council Building Valuation Data (BVD) using a regional construction cost adjustment factor of .85 except where a valid cost breakdown is submitted to and approved by the POD. A valid cost breakdown shall be the actual contract cost (including all labor and materials) as provided by the applicant and accepted as reasonable by the POD. Alterations or tenant buildouts shall use 50% of the BVD calculation used above except where a valid cost breakdown is submitted to and approved by the POD which shall be the actual contract cost (including all labor and materials) as provided by the applicant and accepted as reasonable by the POD. When labor or material cost are not charged or imposed the valuation shall be based on the BVD calculation used above.
The valuation of fences, walls, roofs, screen enclosures, swimming pools, signs, satellite antennas, elevators, standpipes and sprinkler systems, gasoline tanks and pumps, and high pressure boilers shall be based on actual contract cost (including all labor and materials) or estimated cost as established by the POD based on the cost typically charged for the work.
Other permit fees: The permit fees shall be based on the total construction value of all permits applied for (electrical, mechanical, plumbing, etc.) as determined in this chart. The permit fees are based on the valuation of the proposed work and are required in order to defray the costs of inspection, plan review and enforcement provisions of the Florida Building Code, local ordinances, and other building and fire code related regulations.Where the valuation does not exceed $1,000.00 50.00 For a valuation over $1,000.00, up to and including $1,000,000.00:
For each $1,000.00 or fraction thereof:
Single Family Residential and Duplexes
Commercial (this includes all other uses)
For Single-Family Dwelling (not including townhomes or other multi-family uses) less than or equal to 1,400 habitable square feet (flat fee)
7.00
9.00
250.00For a valuation over $1,000,000.00:
First $1,000,000.00
Plus, for each additional $1,000.00 or fraction thereof:
9,000.00
3.00Property owner surcharge: to be charged for each permit issued to a property owner for work costing more than $2,000.00 20.00 Building Related Permit Fees: Affidavit Permit
If Authorized by the POD prior to start of construction:
Single-family residential
Commercial and all other residential
If not authorized by the POD prior to start of construction (see Section 12-4 for additional permit fees when work was started without permit(s):
Single-family residential
Commercial and all other residential
100.00
500.00
250.00
750.00Change of address:
First address
Each additional address on the same property
50.00
20.00Demolition (additional permit(s) may be required):
Demo base fee up to 5,000 square feet
Over 5,000 square feet
125.00
250.00Driveway Permit, residential—
Construction up to two driveways and/or curb cuts and construction of sidewalk
(additional DRS and Engineering fees may apply)45.00 Early Start authorization, per request 100.00 Flood Insurance:
Flood determination letter
Community flood elevation certificate
60.00
100.00Housemoving:
Relocating a house within the City of St. Petersburg
Moving a house into the City
Moving a house outside the City
250.00
250.00
250.00Property card subscription service
Up to 20 requests per month, with escrow account, or $5.00 per request50.00 Permit Extension up to 90 days:
Commercial
Residential
Each additional 30 days
Extension after permit expiration
Extension after permit expiration of two or more permits for same parcel
75.00
50.00
250.00
250.00
350.00Private provider:
Permit fee for application with inspections to be performed by outside entity (contracted by applicant):
The permit fee for an application when the Building Official has approved the request of the applicant to have an outside entity, contracted by the applicant, perform the required inspections shall be one-half of the permit fee of the proposed structure as calculated pursuant to this chapter, with a minimum $55.00 fee (this does not include any fees paid to the outside entity).
See descriptionRefunds of permit fee only (not plan review or other fees)
Work has not commenced and the permit is less than six months old
Work has commenced or the permit is over six months oldPermit fee paid minus 75.00
No RefundService Permits:
Specified single-family and duplex residential permit fees
Air conditioning unit changeout (no electric)
Air conditioning unit changeout (with electric)
Hot water heater unit changeout (no electric)
Hot water heater unit changeout (no gas)
Hot water heater unit changeout (with electric)
Hot water heater unit changeout (with gas)
Hot water heater unit changeout (with electric and gas)
Tankless hot water heater unit changeout (with plumbing)
Tankless hot water heater unit changeout (with plumbing and electric)
Tankless hot water heater unit changeout (with plumbing and gas)
Tankless hot water heater unit changeout (with plumbing, gas and electric)
65.00Special project fee:
A fee charged for special services requiring staff research, inspections, document preparation and other assistance that is beyond the scope of services routinely provided by a department. The fee will be calculated based on actual staff time and other related costs that are incurred in order to complete the request.Minimum fee 30.00 Temporary Use permit (additional plan review, DRS and Fire fees may apply) 50.00 Building Related Plan Review Fees Plan Review:
One- and two-family dwellings:
New Construction
Additions and renovations
50.00
30.00All other uses (including multifamily, commercial and industrial) the plan review fee shall be 20 percent of the estimated permit fee with a minimum fee of 50.00 which shall be paid at the time of submission of the permit application See Description Plan consultation fee (preliminary building plan review), will be calculated based on the cost of staff attending the meeting plus overhead. This fee shall be applied as a credit towards the applicable plan review fees if the application is submitted within 180 days of the initial meeting date. Additional meetings may incur additional fees which shall be nonrefundable and shall not be applied as a credit. See Description Private Provider:
Plan review fee for plans reviewed by a private entity contracted by the permit applicant, pursuant to the provisions in F.S. § 553.791, the plan review fee shall be one-half of the fee calculated pursuant to this Chapter (this does not include any fees paid the outside entity) with a minimum of 45.00.See Description Master Plan:
Plan review fee for master plan (which is intended to be used for multiple properties) for new single-family structures:
Review of a master plan
150.00Review of an individual application building using an approved master plan 30.00 Plan resubmittal fee:
Plans submitted for review after second correction comments are made are subject to additional plan revision review feesSee plan revision fees Plan revision review fee:
Commercial revisions review:
One page
Each additional page
45.00
12.00Residential revisions review 45.00 Certificate of occupancy (C.O.):
C.O. single-family and duplex residential
C.O. commercial
C.O. temporary single-family residential per unit
C.O. temporary commercial, per unit (90 days)
Each additional 30 days
75.00
125.00
75.00
200.00
200.00Certificate of completion (C.C.) 100.00 Certificate of use 100.00 Change of use:
Subject to normal building permit fee based on valuation (may be subject to MIF fees)
50.00 minimumEarly release of power:
Early release of power commercial
Early release of power residential
125.00
50.00Temporary Use plan review (separate DRS and Fire review fees may be required) 50.00 Flat Fee Permits Photo voltaic systems 200.00 Solar water heater (includes electric permit if required) 200.00 Solar pool heating 100.00 Pools/spas above ground (plus electric permit if required) 75.00 Pools/spas inground (plus electric permit if required) 250.00 Pool enclosure 250.00 Antennas more than 30 feet above grade, on existing structures 65.00 Other - Plumbing with no required plan review and one inspection 65.00 Other - Electrical with no plan review and one inspection 65.00 Other - Mechanical with no plan review and one inspection 65.00 Mobile home removal 65.00 Mobile home installation including foundation (MEP extra) 190.00 Reroof up to 15 squares (a sq. equals 100 sq. ft.) 100.00 Reroof over 15 squares up to 40 squares (a sq. equals 100 sq. ft.) 150.00 Reroof over 40 squares (a sq. equals 100 sq. ft.) 300.00 Masonry walls or fences up to 300 LF 150.00 Masonry walls or fences over 300 LF 250.00 Signs - pylon, pole, billboards (plus electric permit if required) 150.00 Signs - walls sign (plus electric permit if required) 110.00 Siding including stucco, wood or vinyl 120.00 Fascia soffit 60.00 Sheds 60.00 Tanks 60.00 Electric - commercial alarm - low voltage 40.00 Electric pre-power inspection 65.00 Saw pole 120.00 Electric Service Change - Residential 100.00 Electric Service Change - Commercial 125.00 Electric Service recertification (service and riser only) 175.00 Special Services: Fees for specialized services Inspections:
Reinspection fee after a second failed reinspection for noncompliance with at least one of the same code deficiencies
Single-family consultation and partial inspection
Inspection appointments per Division procedure
Saturday inspection with minimum of three inspections (fee per inspection)
Commercial partial inspections unless waived by POD due to complexity of a project
100.00
65.00
75.00
90.00
65.00Plan review:
Expedited plan review (when available):
First reviewPlan review fee plus 30% Second and each subsequent review of same plan Additional 30% of the plan review fee Other agency fees:
Multimodal impact fee:
To be assessed in accordance with Pinellas County Ordinance 85-43, as amended, except as additionally required in the Gateway Areawide Development of Regional Impact.
Surcharge: Florida surcharge to be assessed in accordance with F.S. 553.721 and 468.631(7)
Reserved.
(8)
Land development regulation services fees.
Adult use permit:
New Application ..... $1,000.00
Renewal ..... 150.00
Airport obstruction permit ..... 300.00
Alcoholic beverage establishments:
Off-site consumption ..... 100.00
On-site consumption ..... 200.00
Appeal decision of:
Commission ..... 300.00
POD ..... 250.00
Change of use:
Involving grandfathered or nonconforming uses ..... 200.00
Involving only permitted uses ..... 20.00
Community garden permit:
New application ..... 100.00
Renewal ..... 50.00
Dock permit ..... 40.00
Dog dining permit ..... 10.00
Driveway permit ..... 20.00
Extensions:
Of staff approval ..... 50.00
Of commission approval ..... 250.00
FEMA - Historic flood info and letter:
First hour of research ..... 60.00
Additional time billed in one-hour increments ..... 50.00
per hourFood truck rally permit:
Letter prepared by zoning official (no bldg. permit) ..... 40.00
Approved over zoning counter (with bldg. permit) ..... 10.00
Lot line adjustment:
Administrative review ..... 200.00
Commission review ..... 300.00
Lot line splitting:
Administrative review ..... 200.00
Commission review ..... 300.00
Lot refacing:
Administrative review ..... 300.00
Commission review ..... 500.00
Mobile food establishment permit:
New application ..... 170.00
Renewal ..... 85.00
Property card interpretations (PCI):
First hour of research ..... 60.00
Additional time billed in one-hour increments ..... 50.00
per hourPushcart vending permit:
New application ..... 170.00
Renewal ..... 85.00
Redevelopment plan review ..... 500.00
Rehearing request of Commission public hearing action ..... 250.00
Reinstatement review:
Administrative review ..... 200.00
Commission review ..... 500.00
Roadside vending market permit:
New application ..... 100.00
Renewal ..... 50.00
Sidewalk café permit:
Application to establish ..... 35.00
Plus First year cost per chair ..... 20.00
Annual renewal cost per chair (on time) ..... 10.00
Annual renewal cost per chair (late) ..... 15.00
Sidewalk retail display permit:
Application to establish ..... 35.00
Annual renewal (on time) ..... 10.00
Annual renewal (late) ..... 15.00
Sign permit - included in zoning review of building permit
Site plan review:
General application, by commission ..... 1,000.00
General application, by POD ..... 500.00
General application, related to special exception ..... 0.00
Modification, by Commission ..... 500.00
Modification, By POD ..... 250.00
Special exception request:
General application ..... 1,000.00
Modification ..... 500.00
Street closure:
Permanent ..... 1,000.00
Temporary ..... 1,000.00
Street name change ..... 1,000.00
Subdivision/replat:
No variances ..... 650.00
With variances ..... 1,000.00
Temporary parking lots, stadium and non-stadium:
Application to establish ..... 400.00
Annual renewal per lot ..... 40.00
Temporary use permit:
Letter prepared by zoning official (no bldg. permit) ..... 40.00
Approved over zoning counter (with bldg. permit) ..... 10.00
Tree removal permit:
One- and two-unit ..... 40.00
3 or more units and nonresidential (first 2 trees) ..... 60.00
3 or more units and nonresidential (each add. tree) ..... 10.00
3 or more units and nonresidential (inspection) ..... 25.00
After-the-fact, removal without prior approval:
One- and two-unit (per tree):
Per tree, first 12" ..... 150.00
Per tree, plus $50.00 per inch exceeding 12", not to exceed ..... 500.00
Per tree, stump removed, no. of inches unknown ..... 500.00
3 or more units & nonresidential (per tree):
Per tree, first 12" ..... 100.00
Per tree, plus $100.00 per inch exceeding 12", not to exceed ..... 1,000.00
Per tree, stump removed, no of inches unknown ..... 1,000.00
Tree trimming permit, grand tree, per tree ..... 40.00
Vacation:
Air rights ..... 1,000.00
Easements ..... 500.00
Pedestrian walkway ..... 400.00
Rights-of-way ..... 1,000.00
Variances:
Adult use (to distance requirements) ..... 1,000.00
After-the-fact ..... 500.00
Alcoholic beverage (to distance requirements) ..... 500.00
Docks ..... 400.00
Flood elevation ..... 300.00
One- and two-unit (1st variance) ..... 300.00
One- and two-unit (each addl. variance) ..... 100.00
3 or more units and& nonresidential (1st variance) ..... 300.00
3 or More Units and nonresidential (each addl. variance) ..... 100.00
Redevelopment plan ..... 100.00
Reinstatement ..... 100.00
Signs ..... 500.00
Any variance w/SE or SPR application ..... 200.00
Zoning review of bldg. permit applications:
Building permit incl. inspection:
One- and two-unit ..... 15.00
3 or more units and nonresidential ..... 30.00
Landscaping and parking paving incl. inspection:
One- and two-unit ..... 15.00
3 or more units and nonresidential ..... 50.00
Signs ..... 40.00
Zoning (verification and rebuild) letters ..... 40.00
Zoning permit (general):
Application fee ..... 50.00
Permit fee ..... 50.00
URBAN PLANNING:
Map amendment:
Future land use (Countywide FLUM) & rezoning ..... 2,400.00
Future land use (City FLUM) & rezoning ..... 2,000.00
Rezoning only ..... 2,000.00
Mod. or removal of cond. related to an ord. of rezoning ..... 2,000.00
Street naming and co-naming ..... 500.00
Text amendment:
Comprehensive plan ..... 2,000.00
Land development regulations ..... 2,000.00
Development agreement:
Initial application ..... 2,000.00
Modification ..... 2,000.00
HISTORIC PRESERVATION:
Ad valorem tax exemption ..... 0.00
After-the-fact applications ..... twice the
initial feeCertificate of appropriateness (COA):
Commission review:
Additions ..... 300.00
Appeal ..... 250.00
Alterations and repair ..... 300.00
Demolition (primary building) ..... 1,000.00
Demolition (accessory structure) ..... 500.00
New construction ..... 300.00
Relocation ..... 500.00
Staff review:
General application ..... 50.00
Appeal ..... 250.00
Revision of previously approved COA ..... ½ orig. fee
Historic designation:
Third party - Owner opposed ..... 200.00
Third party - Owner supports ..... 200.00
Owner is applicant ..... 200.00
Historic district designation:
Base fee ..... 200.00
Plus cost per parcel ..... 10.00
per parcel,
1,000.00 maxHistoric plaque/marker approval ..... 100.00
Transfer development rights ..... 500.00
Certificate to dig ..... 50.00
(9)
Other service fees.
Convenience fees for online and telephone payments ..... $2.00
Special assessment lien recording and releasing fee (if this fee is included in a special assessment and if the special assessment is paid in full prior to recordation, this fee shall be deducted from the total; if this fee was not included in a recorded special assessment, it shall be added to the amount of the final payment) ..... 35.00
Lien research fees ..... 55.00
Amendments to a redevelopment plan approved by the CRA ..... 2,000.00
Developments of regional impact:
Initial application ..... 1,000.00
Notice of proposed change ..... 1,500.00
Substantial deviation application ..... 2,500.00
Annual report ..... 150.00
Appeal of denial of moving permit ..... 100.00
Codes inspection of a property ..... 50.00
Code lien release requests, per property:
By property owner ..... 50.00
By any other entity (e.g. mortgage company) ..... 100.00
Each successive lien release request by the same entity for the same property ..... 100.00
Public vehicle certificate ..... 95.00
Sewer and water services fees:
To be assessed in accordance with Chapter 27
Special projects fee: A fee charged for special services requiring staff research, inspections, document preparation and other assistance that is beyond the scope of services routinely provided by a department. The fee will be calculated based on actual staff time and other related costs that are incurred in order to complete the request.
Minimum fee ..... 30.00
Transportation impact fee:
To be assessed in accordance with Pinellas County Ordinance 85-43, as amended, except as additionally required in the Gateway Areawide Development of Regional Impact.
Requests for City staff to appear and speak before other agencies, hourly charge based on labor plus materials and other costs.
Research fees not related to above enumerated applications and not related to public records requests, hourly charge based on labor plus materials and other related costs.
(10)
Engineering fees.
General:
Development permit—Construction of lakes and borrow pits, public utilities, sidewalks, and/or roadways which will become city owned and maintained and which are associated with a new development ..... $150.00
All required inspection and testing ..... Actual Costs
Driveway permit, commercial—Construction of up to two driveways and/or curb cuts and construction of sidewalk ..... 130.00
Driveway permit, residential—Construction of up to two driveways and/or curb cuts and construction of sidewalk ..... 65.00
Sidewalk—Construction of new or replacement sidewalk ..... 25.00
Minor easements—Encroachments under, on, or over streets, alleys, rights-of-way, easements and other public land and waters ..... 150.00
Appeal to city council ..... 200.00
Miscellaneous permit—Issued in conjunction with minor easement or for other miscellaneous work requiring engineering inspection ..... 180.00
Seawalls:
Concrete—Construction of up to 100 linear feet of new concrete seawall ..... 200.00
Per foot charge over 100 linear feet ..... 1.40
Non-concrete—Construction of up to 100 linear feet of new non-concrete seawall ..... 155.00
Per foot charge over 100 linear feet ..... 1.03
Construction of rip-rap and structural repair to an existing seawall of up to 100 linear feet ..... 140.00
Per foot charge over 100 linear feet ..... 0.90
Non-structural repairs to an existing seawall ..... 60.00
Utilities:
Public utility connection—No pavement cut; fee per each utility involved and per each connection ..... 200.00
Public utility connection—Pavement cut; fee per each utility involved and per each connection ..... 300.00
Note: The POD may require a good and sufficient bond or letter of credit for any permit issued hereunder to insure satisfactory completion and to guarantee the work for a period of one year.
(11)
Payment in lieu of providing stormwater quality improvements for redevelopment sites per acre or fraction thereof.
Year:
Payment per Acre
FY 1998 $ 8,623.00 FY 1999 8,968.00 FY 2000 9,327.00 FY 2001 9,700.00 FY 2002 10,088.00 FY 2003 10,492.00 FY 2004 10,911.00 FY 2005 11,347.00 FY 2006 11,801.00 FY 2007 12,273.00 FY 2008 12,763.00 FY 2009 13,275.00 FY 2010 13,805.00 FY 2011 14,358.00 FY 2012 14,932.00 FY 2013 15,529.00 FY 2014 16,151.00 FY 2015 16,797.00 FY 2016 17,468.00 FY 2017 18,167.00 FY 2018 18,894.00 (12)
Adult use.
Adult use license application fee ..... $500.00
Plus $15.00 for each individual's criminal history check or such other amount as required by the FDLE
Annual adult use license fee ..... 100.00
Appeal of a decision of the POD ..... 300.00
(13)
Dance halls.
Dance hall permit application fee ..... 100.00
Plus $35.00 for each individual's criminal history check or such other amount as required by the FDLE
Annual dance hall permit fee ..... 100.00
Appeal of a decision of the chief of police or POD ..... 100.00
(Code 1973, § 34-11; Code 1992, § 12-11; Ord. No. 1098-F, § 2, 5-18-1989; Ord. No. 1163-F, §§ 1—5, 4-19-1990; Ord. No. 45-G, § 1, 9-17-1992; Ord. No. 116-G, § 1, 10-21-1993; Ord. No. 143-G, § 1, 4-7-1994; Ord. No. 145-G, § 1, 4-7-1994; Ord. No. 156-G, § 1, 7-7-1994; Ord. No. 179-G, § 1, 11-3-1994; Ord. No. 274-G, § 1, 3-6-1997; Ord. No. 303-G, § 1, 11-20-1997; Ord. No. 304-G, § 1, 11-20-1997; Ord. No. 309-G,§ 1, 1-8-1998; Ord. No. 349-G, § 2, 10-1-1998; Ord. No. 369-G, § 1, 1-21-1999; Ord. No. 397-G, § 5, 7-1-1999; Ord. No. 410-G, § 1, 12-16-1999; Ord. No. 418-G, § 2, 4-6-2000; Ord. No. 453-G, § 1, 12-14-2000; Ord. No. 556-G, § 1, 10-3-2002; Ord. No. 557-G, § 2, 10-3-2002; Ord. No. 564-G, § 1, 11-7-2002; Ord. No. 798-G, § 2, 12-14-2006; Ord. No. 908-G, § 1(12-11), 1-8-2009; Ord. No. 1020-G, § 1, 7-14-2011; Ord. No. 4-H, §§ 1, 2, 11-21-2011; Ord. No. 39-H, §§ 1—6, 8-16-2012; Ord. No. 53-H, § 3, 11-1-2012; Ord. No. 58-H, § 3, 12-6-2012; Ord. No. 64-H, §§ 1—3, 1-24-2013; Ord. No. 116-H, § 4, 6-19-2014; Ord. No. 166-H, §§ 25, 26, 5-21-2015; Ord. No. 157-H, § 7, 9-17-2015; Ord. No. 284-H, § 1, 7-13-2017; Ord. No. 295-H, § 7, 10-5-2017; Ord. No. 319-H, § 1, 2-15-2018)